Week 19: More rough-ins, more concrete!

Thom had the difficult task of forming the front steps to withhold the pressure of 7 meters of concrete... and did a fantastic job!  The poured steps are the main landscaping feature on the front, along with the faux retaining wall in the front of the steps to complete the modern look.

 