Skip to main content

Week 27: Exterior finishes

Some of the front details are taking shape, while Fred was installing tile after the tapers finished.  The stucco guys finished the front facade (dark grey below), while George was around to do the soffits and start the longboard.  The prefinished metal product is a super long lasting, durable (and expensive) alternative to wood.  The front door looks great, though George is going to come back and make a slightly more random pattern in the various tones of "wood".



Comments

Popular posts from this blog

Week 35: Interior hardware

Still no Enbridge, so this little green electric heater is heating the whole house! Mick has finished spraying in the house, so Jampa swung by to install all of the interior hardware.

Final post

Week 2: Footings and bench pinning

Phil, Miguel's footing guy, was in at the start of the week to layout the footings.  After pouring, I was able to get Thom in there to form and pour the bench pinning (kind of like underpinning, but poured in one shot to allow for a deeper basement level for the rec room).