While we did have to do some manual demo inside, it was really just for parts that the machine couldn't reach. Artur from BR was in this week to take down the roof and half the walls and excavate the back.
Phil, Miguel's footing guy, was in at the start of the week to layout the footings. After pouring, I was able to get Thom in there to form and pour the bench pinning (kind of like underpinning, but poured in one shot to allow for a deeper basement level for the rec room).