Week 12: HVAC Begins

One heating and cooling option on larger, modern houses, is to put in an upstairs and downstairs furnace.... this separates heating and cooling needs of the 2nd, 1st and basement levels.  In this house, the client has opted for a Carrier motorized damping system so it's like a virtual 2nd floor unit whereby 2nd floor and 1st floor thermostats talk to each other to correct how much air is flowing into each volume.

The guys from Pinewood finished the 2nd floor duct runs this week and are heading downstairs.


Comments

Popular posts from this blog

Week 35: Interior hardware

Still no Enbridge, so this little green electric heater is heating the whole house! Mick has finished spraying in the house, so Jampa swung by to install all of the interior hardware.

Final post

Week 2: Footings and bench pinning

Phil, Miguel's footing guy, was in at the start of the week to layout the footings.  After pouring, I was able to get Thom in there to form and pour the bench pinning (kind of like underpinning, but poured in one shot to allow for a deeper basement level for the rec room).