Now that the garage is poured, we can continue with the ductwork making it's way through the garage and into the basement.   Thom turned to the front steps... painstakingly forming, reinforcing, measuring, leveling, correcting.... you get the idea.  Finally, at the end of the week, he poured them and it turned out great.








Comments

Popular posts from this blog

Week 2: Footings and bench pinning

Phil, Miguel's footing guy, was in at the start of the week to layout the footings.  After pouring, I was able to get Thom in there to form and pour the bench pinning (kind of like underpinning, but poured in one shot to allow for a deeper basement level for the rec room).

Final post

Week 38: Finishing Touches

With just a couple of weeks to go before a slightly moved up desired move-in date, we are getting the final touches prepared in the house.  Backsplashes, stair finishing, vanities hung and more.