Now that the garage is poured, we can continue with the ductwork making it's way through the garage and into the basement.   Thom turned to the front steps... painstakingly forming, reinforcing, measuring, leveling, correcting.... you get the idea.  Finally, at the end of the week, he poured them and it turned out great.








Comments

Popular posts from this blog

Final post

Week 35: Interior hardware

Still no Enbridge, so this little green electric heater is heating the whole house! Mick has finished spraying in the house, so Jampa swung by to install all of the interior hardware.

Week 19: More rough-ins, more concrete!

Thom had the difficult task of forming the front steps to withhold the pressure of 7 meters of concrete... and did a fantastic job!  The poured steps are the main landscaping feature on the front, along with the faux retaining wall in the front of the steps to complete the modern look.