Skip to main content

Week 15: Backframing

Even though some of the HVAC is not done, we've begun backframing the upstairs, main floor and basement.  The backframers are in charge of the little things - boxing duct work, straightening walls, strapping basement walls etc.



Comments

Popular posts from this blog

Final post

Week 2: Footings and bench pinning

Phil, Miguel's footing guy, was in at the start of the week to layout the footings.  After pouring, I was able to get Thom in there to form and pour the bench pinning (kind of like underpinning, but poured in one shot to allow for a deeper basement level for the rec room).

Week 38: Finishing Touches

With just a couple of weeks to go before a slightly moved up desired move-in date, we are getting the final touches prepared in the house.  Backsplashes, stair finishing, vanities hung and more.