Week 16: Electrical rough in and stucco

Tony did a quick rough in of the plumbing drains early in the week, which meant Kevin could come and start the electrical.  We did a walkthrough with Shaun and Amber and made a lot of the key decisions to move things forward.




On the outside, the stucco is being applied to the back and sides of the house.  The front will be finished with a combination of stone and longboard.