Skip to main content

Week 18: Rough-ins and garage

Rough-ins are continuing inside, while Thom came in and poured and finished the garage slab.  Sweet!



Comments

Popular posts from this blog

Final post

Week 2: Footings and bench pinning

Phil, Miguel's footing guy, was in at the start of the week to layout the footings.  After pouring, I was able to get Thom in there to form and pour the bench pinning (kind of like underpinning, but poured in one shot to allow for a deeper basement level for the rec room).

Week 38: Finishing Touches

With just a couple of weeks to go before a slightly moved up desired move-in date, we are getting the final touches prepared in the house.  Backsplashes, stair finishing, vanities hung and more.