Now that the stucco is done on the back and sides, George's team was in to install the soffits, fascia and eaves in the same Iron Ore as the window colour.
Phil, Miguel's footing guy, was in at the start of the week to layout the footings. After pouring, I was able to get Thom in there to form and pour the bench pinning (kind of like underpinning, but poured in one shot to allow for a deeper basement level for the rec room).
Comments
Post a Comment