Skip to main content

Week 27: Exterior finishes

Some of the front details are taking shape, while Fred was installing tile after the tapers finished.  The stucco guys finished the front facade (dark grey below), while George was around to do the soffits and start the longboard.  The prefinished metal product is a super long lasting, durable (and expensive) alternative to wood.  The front door looks great, though George is going to come back and make a slightly more random pattern in the various tones of "wood".



Comments

Popular posts from this blog

Final post

Week 40: Move in!!!

Move in day was a success!  The house looks great Shaun and Amber have been an absolute pleasure to work with (also confirmed by the fact that my trades love them too!). We can't start landscaping the outside for another 4-6 weeks, so more photos will follow when that's all done!

Week 2: Footings and bench pinning

Phil, Miguel's footing guy, was in at the start of the week to layout the footings.  After pouring, I was able to get Thom in there to form and pour the bench pinning (kind of like underpinning, but poured in one shot to allow for a deeper basement level for the rec room).