Week 29: Floor installation complete

Jampa finished the 2nd floor hardwood installation and moved on to the basement where they've chosen a laminate with a similar finish to the hardwood.





Comments

Popular posts from this blog

Final post

Week 35: Interior hardware

Still no Enbridge, so this little green electric heater is heating the whole house! Mick has finished spraying in the house, so Jampa swung by to install all of the interior hardware.

Week 18: Rough-ins and garage

Rough-ins are continuing inside, while Thom came in and poured and finished the garage slab.  Sweet!